Container power station

  • 1. PI diagrame
    Customer responsible

  • 2. Solution

  • 3. 3D model

  • 3. 3D model

  • 4. Working drawings

  • 5. Logistics, transportation

  • 6. Production (Execution)

Project SPARTAK AS FILTER Estonia GE Jenbacher

Project target: producing of two containerized generators modules with JMC 612 GS-N.LC

Requirements of the customer, customer’s delivery:

  • Technical specification of power plant body.
  • PI diagram.
  • Power plants equipment specifications and drawings.
  • Power plants equipment delivery.

Responsibility of the executor - FELIUGA UAB (Tallinn’s workshop)

  1. Design project: working container’s structure drawings, stress calculation, piping layout and ISO’s, electrical and insulation drawings.
  2. Preparation works: MTO lists, delivery of materials, parts prefabrication.
  3. Producing works: container’s structure assembling, pipes assembling, cable and cable tray mounting, equipments mounting, welding, testing, painting, disassembling after clients confirmation, packing, loading on trucks.